Check
This step allows to verify and edit the analysis manually. The coverage thresholds are displayed as a reminder.
- At the startup of the command, the 3D scene split in two views: - An overall view, called Progress View, displaying the whole project and where you can select a specific BIM part to inspect. 
- A detailed view containing detailed information about the current selected BIM part, if any. 
 
- In the dialog, a Result table lists all BIM part and some associated data such as the coverage score, current status and global offset (median value of the offset distribution). 
 Each time a new element is clicked in the table, the 3D views are updated. Press SPACE to change the current element status.
 The table header columns can be sorted.
- Optionally, filter the visible parts according to their status. 
- Optionally, modify the parts Transparency to be able to see possible inner points. This transparency is temporary applied when checking the selected part. 
- Then click Next to validate and continue (Export). 
Several shortcuts are available in from the 3D views:
- Arrow Up/Dow to change the current selection in the Result table 
- H to toggle the visibility of the selected BIM part 
- Space to change the current element status